Project was an Emergency response project completed as fast as possible. Repairs included site clearing and grading stabilization of the slope face by installing an anchored wire mesh system of approximately 43,000 SF shotcrete apron on the upper face of the slope for erosion protection construction of a concrete cantilever slab and miscellaneous utility replacements.īeattyville, KY Rockslide Emergency Removal, ($398,000) Completed March of 2011. Constructed permanent repair of a landslide resulting from a cyclone. Completed months ahead of schedule and under budget with 0 reported accidents or injuries. Repair of Route 18, Utulei, American Samoa ($2,488,880) Completed Dec of 2011 Heavy Equipment Operator/Foreman for the project. Heavy Equipment Operator, Foreman, Superintendent, Safety Officer, 2009 - 03/2012